Completed

Project Overview

The Interstate 25 Highway Expansion Project was a major infrastructure initiative to alleviate traffic congestion and improve transportation efficiency between Building City and North City. This comprehensive project involved expanding a 25-mile stretch of interstate highway from four to six lanes, reconstructing three major interchanges, and implementing intelligent transportation systems.

Project Duration 18 Months
Project Value $3 Million
Highway Length 25 Miles
Workforce 150+ Workers

Project Challenge

The existing four-lane highway was operating at 140% capacity during peak hours, leading to significant traffic congestion, increased travel times, and higher accident rates. The aging infrastructure required modernization to meet current safety standards and accommodate future growth projections.

Our Solution

KGM Construction implemented a phased construction approach that maintained traffic flow throughout the project. Our solution included:

  • Adding one lane in each direction with reinforced concrete pavement
  • Reconstructing three major interchanges with improved ramp designs
  • Installing advanced drainage systems to prevent flooding
  • Implementing smart traffic management systems
  • Adding emergency pull-off areas and improved lighting

Key Achievements

45% Reduction

in peak hour travel times

30% Decrease

in accident rates

2 Months Ahead

of schedule completion

Excellence Award

for innovation in construction

Project Phases

Systematic approach to ensure quality and timely delivery

Phase 1: Planning & Design

3 Months

Comprehensive traffic analysis, environmental impact assessment, and detailed engineering design. Coordination with multiple stakeholders including local municipalities and utility companies.

Phase 2: Earthworks & Grading

4 Months

Mass excavation, subgrade preparation, and precise grading to establish proper road alignment and drainage patterns. Installation of underground utilities and drainage systems.

Phase 3: Base Construction

3 Months

Placement and compaction of aggregate base courses. Installation of reinforced concrete for bridge decks and retaining walls. Quality control testing of all materials.

Phase 4: Paving & Finishing

5 Months

Concrete paving operations, asphalt overlay, installation of guardrails, signage, and intelligent transportation systems. Final landscaping and site restoration.

Innovative Technologies Used

GPS Machine Control

Precision grading and excavation using GPS-guided equipment for accurate earthworks and reduced material waste.

Drone Surveying

Aerial mapping and progress monitoring using drone technology for efficient site management and documentation.

Automated Paving

Computer-controlled paving equipment for consistent thickness and smoothness of concrete surfaces.

BIM Modeling

Building Information Modeling for clash detection, quantity takeoffs, and construction sequencing.

"KGM Construction delivered exceptional results on the I-25 expansion project. Their innovative approach to maintaining traffic flow while completing complex construction work was impressive. The project was completed ahead of schedule and under budget, with quality that exceeds our expectations."